InsightsAdoption
Published Updated 4 min read
How to prove an AI process before you switch
Run the new way beside the old one until every total agrees and the people who own the work sign off. Then switch, one process at a time.
Chad Neptune, CEO and Chief AI Architect
Two lanes run in parallel: the way you work today and the redesigned way. Nothing in the new lane replaces the old one until the switch.
Why run two lanes
A new process can look right and still disagree with the books. The surest way to know is to run both and compare. So the redesigned lane never replaces the working one on a date, only on agreed totals.
A switch made on a calendar date moves the risk onto the people doing the work. A switch made on agreed totals does not.
For leaders Do not set a switch date. Set the condition for switching, and let the totals meet it.

What gets compared
We compare the totals each period. Both lanes work from the same records over the same period, and the totals are set next to each other.
Where a total differs, the difference is traced to its cause before anyone talks about switching.
| The way you work today | The redesigned way | |
|---|---|---|
| Records | The records your people use now | The same records, over the same period |
| Totals | Produced each period as usual | Set next to the old totals each period |
| When a total differs | Keeps running | The difference is traced to its cause before anyone talks about switching |
| Who signs off | The people who own the work | The same people, before any switch |
| At the switch | Stays in place until you decide | Takes over one process at a time, when you say so |
For leaders Ask for the comparison every period, with every difference explained.
Moving a process onto AI? Talk to a principal.
Who decides when to switch
The people who own the work sign off, and you decide when. The switch happens one process at a time, when you say so.
Leadership, not a vendor and not Resolon, makes that call.
It is one of the decisions that stays yours at every stage.
For leaders Name the people who sign off before the comparison starts.
What if the totals do not agree
Then nothing switches. The old way keeps running while the cause is found and fixed, and the two lanes are compared again.
Every release carries a plan, testing, monitoring and a way to roll back.
For leaders A disagreement is a finding, not a failure. It is the reason for running two lanes.
After the switch
Your team runs the new way, on systems you own. The next process then begins.
The AI is re-checked whenever the ERP or the model underneath it changes: last month’s work is run through the new version and the answers are compared.
For leaders Re-run last month’s work every time the ERP or the model underneath changes.
Signs you are not ready to switch
If any of these is true, keep both lanes running.
- Nobody can say which totals will be compared. Without agreed totals there is nothing to agree on.
- The two lanes work from different records. A comparison across different records proves nothing.
- No owner of the work has signed off. The people who do the job are the ones who see a wrong total first.
- A total that differs has no explanation. Until the cause is traced, nothing switches.
- The switch has a date, not a condition. The calendar decided, not the totals.
- There is no way to roll back. A release without a plan, testing and monitoring is not ready to carry real work.
For leaders One sign is enough. Keep the old lane running.
What to do this quarter
Prove one process before you switch it, then move to the next.
Pick the first process.
Choose one, and name the totals that will be compared each period.
Name who signs off.
The people who own the work, written down before the comparison begins.
Run both lanes on the same records.
Over the same period, with the old way left untouched.
Set the condition for the switch.
Write it as agreed totals and sign-off, not as a date, and keep the decision with leadership.
Frequently asked questions
What does running an AI process side by side mean?
The redesigned process and the current one run at the same time on the same records, and their totals are compared each period. Nothing in the new lane replaces the old one until the people who own the work sign off.
How long should we run the two processes in parallel?
Until every total agrees and the owners sign off, not for a fixed number of weeks. If a total differs, the old way keeps running while the cause is found and fixed, and the two lanes are compared again.
Who decides when to switch to the new process?
The people who own the work sign off, and leadership decides when. Not a vendor, and not Resolon. The switch happens one process at a time.
What happens if the totals do not agree?
Nothing switches. The cause is traced and fixed, and the two lanes are compared again.
What should we check after we switch?
Re-check the AI whenever the ERP or the model underneath it changes. Run last month’s work through the new version and compare the answers.
Share this article
New each month. Follow by RSS
